Omar Aguilera Rico asked Jordan Johnson answered

Shifts in a single operator

I am working on a model where I will simulate three shifts, my question is if I can simulate the three shifts with a single operator and throw the utilization separately for each shift? If this is not possible, would this have to represent an operator for each shift?

FlexSim 18.1.0
dashboardsshifts
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jordan Johnson avatar image
0 Likes"
Jordan Johnson answered

Here is an article I wrote. It shows how to use Process Flow to record multiple state profiles for a single operator, so you can get "per shift" utilization. The article isn't finished, so it's not very detailed, but there is a demo model attached.

https://answers.flexsim.com/articles/49872/operator-utilization-by-shifttime-period.html

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

David Seo avatar image
0 Likes"
David Seo answered
@Omar Aguilera Rico

You can set the shift time table to a operator or more using ToolBox>Time Table menu or the Break Tab in the operator.

So you can control the utilization of the operator according to it.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.