Hey!
Need your help!
I've got a FlexSim modell with ProcessFlow and two products, A and B.
Both products passing Processor2 but afterwards A needs to go to Queue1 and B to another Processor.
Processor2 should be an oven, so the operator will be released for the time the products are processing there. If A or B finished Processor2 the operator should be aquired again to do the next steps, the operator will be aquired with an event triggered source (event: Processor2 has finished).
My problem ist, that the operator mixes the further production process of A and B. How kann I say, if product A has finisched Processor2 than go to Queue1 and if product B has finished Processor2 then got to Processor4?
Attached u find my modell.
Thank u so much!