question

puneet C avatar image
0 Likes"
puneet C asked puneet C commented

AGV MTBF/MTTR

Hello Everyone,

In the attached simple model i am trying to transport items using agv. i used one dispatched for each object. I am trying to simulate situation like if after a particular time my AGV stops working because of Breakdown. During downtime of AGV3 is it possible to take work from AGV2. I connected Processor with two dispatchers but in use transport tab i gave to use only dispatcher3. how i can solve this issue?

FlexSim 17.2.5
agv
dummy.fsm (18.2 KiB)
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Joerg Vogel avatar image Joerg Vogel commented ·

Have you tried to connect the AGV3 with an object connection (A-type) directly to the AGV2. Then run the model and look what happens. All taskexecuters (Operator, Transport, Crane, and so on) are by default dispatcher, too. They can transfer tasksequences to other taskexecuter.

0 Likes 0 ·
puneet C avatar image puneet C Joerg Vogel commented ·

@Jörg Vogel.Thanks for your time.

well in attached model i made changes as per your suggestion. still AGV2 is not able to Perform when AGV3 is on breakdown.

0 Likes 0 ·
dummy.fsm (20.6 KiB)
puneet C avatar image puneet C commented ·

@Jeff Nordgren Hello Jeff

Any suggestion for this issue?

0 Likes 0 ·

1 Answer

Jeff Nordgren avatar image
0 Likes"
Jeff Nordgren answered puneet C commented

@puneet C,

Attached is your model with the changes that I made. Take a look at the model and see if it will now do what you are wanting/describing. If it is not quite right, please let us know.

Thanks.

puneet-dummy-jn1.fsm


· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

puneet C avatar image puneet C commented ·

@Jeff Nordgren yes model is working perfectly. sorry for late response. Thanks

0 Likes 0 ·