Hi,
In my model I need that after the machine (Magnaflux) collects 6 pieces the batch stays for a process time and after that the operator 6 and the crane 4 unload the pieces one by one. I made a PF ,everything runs ok until the load step (Carga uña). See the picture below.
I attached the model. Thanks in advance for your support.