Hi, let's say I have two agvs (agv#1, agv #2). I want to asign the 30% of job to agv#1 and the 70% of job to agv#2. Two agvs are conncected to a dispatcher. And it is not designed with Process flow. Therefore if someone can answer without using Process flow, it would be wonderful. Thank you