I referenced
https://answers.flexsim.com/questions/22784/elevator-loading-unloading-sequence.html
I want to use Process Flow to complete this too. But the version was a little bit old that I can't complete the practices.
There is a problem. How can I make it more reasonable if I have two elevators to achieve the same goal, and the demand comes from different floors.
I want to accomplish two things:
First, after the load is completed, the elevator can unload item according to the floor sequence(from low to high).
Second, if the demand comes from two different floors, all the items at the bottom floor can be loaded first. If there is still have space, going to up floor to load until max content is met, instead of going up to load and going down again.
Sorry, I just started learning Flexsim, there are still many shortcomings. This is what I trying to build, please advise:
Elevator unload.fsm