I have attached a simple model to illustrate my question.
Flow items arrive between 7:30-5:30 Monday thru Friday. (Time Table "Two Shift Arrivals"). They are processed from 7:30-11:30 Monday thru Friday.(Time Table "Shift Sched 2 5")
Machine adjustments happen thru the day (Time Table "Daily Maint")
Time Table "Shift Sched 2 6" is unused.
At 11:30 p.m. on Friday (model time 7170), total ChangeOver time per the pie chart is 3.84% or 275 minutes, which is correct.
At the end of the week (model time 10080), total ChangeOver time per the pie chart is 24.75% or 2495 minutes. I assume the daily maint times are applied over the weekend, but that should only add 110 minutes to the 275, correct?
Is there a correct way to use both daily and weekly time tables?