Hi @Ryan Clark (and others), follow on question to one previously posted. Simplified model attached to be able to demonstrate. Reposted as new topic. Two questions:
1. I tried to reverse the AGV to conveyor load and do a conveyor to AGV load (see Robot 2). This is being done to an entirely different AGV process path. I would imagine I am doing something incorrect with the control points and the work lists between the different AGV paths.
2. In my models the AGV delivering a box needs to complete the drop off before the next package is picked up. This results in only AGV5 picking boxes from Queue2 in my sample file. Is there a way to make it so that the AGV's pick the boxes sequentially and then just queue up a the drop off location.FourthDraftMainSim.fsm