Fluid Tank Material Discharge Delay

Hi,

Below are activities to be done in sequence

1. Completely fill tank 1

2. Hold material in tank 1 for 2 hrs

3. Start filling tank 2 when tank 1 is full

4. Hold material in tank 2 for 2 hrs

5. Discharge tank 1 completely first and then only start discharging tank 2

6. Similarly when tank 2 is completely empty then only start discharge from tank 1


Attaching the model, please let me know if anyone can help me in this

Fluid Model.fsm

FlexSim 21.1.5
fluid object
fluid-model.fsm (117.7 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered Joerg Vogel commented

You know the academic code?

Try to solve your request with object class references like stop/resume or open/close of input or output properties.

· 4
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Prathmesh Khairnar avatar image Prathmesh Khairnar commented ·
Hi, I don't know academic code but I have tried with open/close.

In that case I have two conditions at one point, so I am not able to do it.

When Tank 1 is completely full then only Tank 2 filling will start and when tank 1 is discharging tank 2 has to wait till tank 1 gets empty.

If you can help me do it in the model, it would be really helpful.

-1 Like -1 ·
Joerg Vogel avatar image Joerg Vogel Prathmesh Khairnar commented ·
Karnaugh map
I am sorry, resolving a set of conditions on a time line is something I am not involved in. It is a matrix of events setting logical statements to result in true or false upon you open or close inputs of objects.
0 Likes 0 ·
Prathmesh Khairnar avatar image Prathmesh Khairnar Joerg Vogel commented ·
Okay thank you


0 Likes 0 ·
Show more comments