question

DougCosta avatar image
0 Likes"
DougCosta asked Felix Möhlmann answered

Merge with release point not on Slug Builder Conveyor

I have a merge where one of the lanes is feeding in with a decline right at the merge and accumulation behind the decline. The other lanes are normal with accumulation feeding directly into the merge. Attached is an example model I created of the situation: MergeWithDeclineExample.fsm

mergeexample.png

For the line with the decline the real world controls will have a photoeye at the end of the decline to run the line up to and stop awaiting release into the merge to minimize the gaps between lane releases. I placed a photoeye on the decline in the model but I am not sure how to create the logic in FlexSim to run up the box while also using the slug builder logic and merge controller.

FlexSim 24.0.1
merge controllerslug conveyors
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered

Here's a custom solution that replaces the slug build feature and merge controller with an Object Process Flow that is attached to PEs on the slug conveyors.

mergewithdeclineexample-fm.fsm

I'm not sure if it's 100% what you need, but it might nonetheless be a decent starting point for further customization.


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.