Hello
I'm inquiring because I checked that the lift did not work when the lift and process flow were linked in the model.
As shown in the picture above, I put the travel in CP6 and CP9 and ran the simulation, but the lift does not work.
If I remove the travel corresponding to CP6 and CP9 from the process flow, the lift will work normally again. What is the problem? Is there no solution?
thank's you