Hello Team,
I have worked on the model through process flow. (Please check)
The robot 1 will pick and place box on turn table (10 secs)
The table will turn on other side, robot 2 will work on it (20 secs) therefore parallelly robot1 should pick and place box on other side of turn table
kindly see attached model.
Thanks in advance