question

立洲 avatar image
0 Likes"
立洲 asked 立洲 commented

How to collect the number of times the AGV passes the control point

我想知道AGV通過控制點時有什麼方法可以收集。這個控制點已經多次通過。

如何收集AGV通過控制點的次數.fsm

FlexSim 20.0.10
agvflexsim 20.0.10control pointsdata collector
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Tomasz MG avatar image
0 Likes"
Tomasz MG answered 立洲 commented

Hi

Make each control point a way point to launch events on them. Then put them into the group and give each control point label with a row number. After that build simple logic in PF to increment value on the row that is the row number of the control point.

I attached example.

Good Luck

example.fsm


example.fsm (37.7 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

立洲 avatar image 立洲 commented ·

謝謝,這就是我想要的答案

0 Likes 0 ·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.