Hello, I am new to Flexsim and I need to simulate an automatic loading arrangement of 24 pallets on 2 trucks, which make 12 daily trips.
maximum loading time: 35 minutes and maximum loading time to truck T1: 5 minutes.
Maximum charging time: 31 minutes (low season) - 43 minutes (high season) - 37 minutes average charging time. Maximum loading time to truck T2: 6 minutes
I must reduce loading times and increase the ramp loading factor system by 50%. I have production per month, but I can't raise in Flexsim 23.01.08
Thank you for your cooperation