Destination unreachable with AGV

1.png

Hi, I am experiencing the following issue in the picture. I am trying to get the AGV to move in the order as shown above. The AGV is supposed to load both products from queue 12 and 13 and bring to processor1 and processor2 respectively.

FlexSim 24.2.1
software
1.png (110.9 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered

Those blue lines from network node to queues are missing for your processor objects. Try it with in Object Connection (Type “A”).

Hint, which works for me: I build such tasks several times to understand how a mechanism works.