question

Oscar Perez avatar image
0 Likes"
Oscar Perez asked Matt Long commented

Network node with process Flow

test1.fsm

Hi, does anybody know how to create a process Flow and use the network nodes at the same time.

I´m trying to do a logistic flow, very simple, and I would like to use the network nodes in order to have a nice 3d view

FlexSim 16.2.0
process flow network nodes
question.png (484.5 KiB)
test1.fsm (681.1 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Regan Blackett avatar image
2 Likes"
Regan Blackett answered Matt Long commented

Since you are creating a Truck, you can mostly just substitute your 'Arrive Destination' activity with a 'Travel' activity. The activity you used moves an object instantly from where it is to somewhere else, but the Travel activity gives a task sequence to the Truck that tells it to travel from point A to point B.

The other thing I would do is rather than use BasicFR objects as your origin and destination points would be to just use the nodes themselves. So your create object destination would be node 1 and your travel-to destination would be node 2.

Here's an example of what I mean:

2727-test1.fsm


2727-test1.fsm (680.6 KiB)
· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeff Nordgren avatar image Jeff Nordgren commented ·
0 Likes 0 ·
Oscar Perez avatar image Oscar Perez commented ·

Thanks!!! Now with process flow seems very easy to do all my logistic networks!!! Thanks @regan.blackett

0 Likes 0 ·