Hi!
I explain my problem:
I have one AGV who makes the path between the combiner of rearaxles pallets and the conveyor 5 (the place where the AGV unload the palets). The AGV must also load the pallet of "berceau" (the pink pallets) then unload it on the separator (332,333,334,335). So, there are 4 separators where the AGV must unload the pallet. And the AGV load the 4 separators in the same time .
Now, I would like that the AGV loads one palet on the first separator, then loads one palet of rearaxles and after loads a second pallets on the second separators...
Thank you for your help.