question

yoni A avatar image
0 Likes"
yoni A asked yoni A commented

shift schedules

how to set up shift schedules. so when a shift is over machines stop producing until the next day at 7:00 am, or if you have a second shift then on thirds shift machines stops producing

FlexSim 18.0.3
shift schedule
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

yoni A avatar image yoni A commented ·

I have three time tables one for break from 9:15 am to 9:30 am and from 2:00 pm to 2:15 pm, I have another time table for lunch from 12:00 pm to 12:30. pm and added a third timetable after 3:30 pm to make the machines stop, it works but , on the statistic collector, the bar that increases is the one related to break as if after 3:30 pm til 7:00 they are on break, when I called that bar off shift in the time table, at some point there is overlap of non productive time of the timetables, how do I make the statistics collector to reflect the real bar for break, lunch, off shift, is there any way to set priorities?

0 Likes 0 ·
yoni A avatar image yoni A yoni A commented ·

I have three time tables one for break from 9:15 am to 9:30 am and from 2:00 pm to 2:15 pm, I have another time table for lunch from 12:00 pm to 12:30. pm and added a third timetable after 3:30 pm to make the machines stop, it works but , on the statistic collector, the bar that increases is the one related to break as if after 3:30 pm til 7:00 they are on break, when I called that bar off shift in the time table, at some point there is overlap of non productive time of the timetables, how do I make the statistics collector to reflect the real bar for break, lunch, off shift, is there any way to set priorities? david.seo

0 Likes 0 ·
Joerg Vogel avatar image Joerg Vogel yoni A commented ·

You find at each time table the option down state. If you have a time table for breaks you assign a different down state then for the off shift.

There isn't a priority of the time table. But the resume function can be linked directly to the stopobject command by an numerical parameter, which starts the down state. This parameter value is used in the resumeobject function to identify the pair of the down state.

0 Likes 0 ·
David Seo avatar image
1 Like"
David Seo answered

eflexsim-projectsgpflexsim-forum-exer-modelstimeta.fsm

@yoni A

Your model need only ONE time table not three time table according to your explanation.

You need to attch your model file to your question to solve your model problem.

I attach the example model.


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

David Seo avatar image
0 Likes"
David Seo answered

@yoni A You can set the time table used to the shift schedule in the Toolbox>Time Tables menu.

Or you can set it in the Breakdowns tab of the objects like processor.

5 |100000