question

Marco Casavecchia avatar image
0 Likes"
Marco Casavecchia asked Marco Casavecchia commented

how to set priority for crane

Hello,

I would like to set a priority for my crane, to pick up first the items form a given processor (the most critical piece of process).

Also, I would like to assign two Operators to the operation of the crane.

Thanks,

Marco

FlexSim 17.2.5
crane movement
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

tannerp avatar image
0 Likes"
tannerp answered Marco Casavecchia commented

Hi @Marco C4,

Here's a basic model that looks at the items in a list based on their "Priority" label. Hopefully this gives you an idea for your model. There are other ways of doing this, but without seeing you model, it's hard for us to assume. Feel free to comment back if you need more help. If you would like additional help, please attach a model for us to provide a better answer. Thanks!

priority-for-crane.fsm


· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Marco Casavecchia avatar image Marco Casavecchia commented ·

thanks a lot, this helps :)

0 Likes 0 ·