hi
How can the operator follow the path?
The Operator follows the path. If he reaches the network node connected to the rack, he goes over into OFFSET travel, which consists of load and unload tasks sofar. If you want to imitate a travel in the aisle, you must design it. You have to use offset travel task types.
Offset task types are
If you have assigned a slot for the item before operators got to tne network node of the rack, you can get the storage slot location. The values of the slot location can you use to design the sequence of offset travel task.
Thank you for your answer @Jörg Vogel.
I found another way to do this by using "use navigator for offset travel" and I also placed the racks closer to the network node and now it works just fine. Thank you for your help anyway.
13 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved