How to use process flow to transport an item from one point to another?

I have been facing problem in my process flow as i could not make the operator2 to load items(5) to the tote , before it get transported by transporter1 to the output . could anybody help me out and tell me is there anything wrong with my process flow?

FlexSim 19.2.4
process flowflexsim 19.2.4
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered Joerg Vogel commented

You need a token in Process Flow that goes from one activity to the next.

The Tote gets filled, if it is a destination for the unload activity.

The tote gets transported if the resource / taskexecuter is a label reference at the token.

I changed the variable references for destinations also to treenode references in all activities for the Transporter1.


· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Glenn tkz avatar image Glenn tkz commented ·

@Jörg Vogel sorry sir i tried editing the unload task sequence , but the operator2 still does not seem to move to load the item to the tote. i added in the source as well in the process flow

0 Likes 0 ·
Braydn T avatar image Braydn T Glenn tkz commented ·

@Glenn tkz Could you upload your model with the changes, so we can help trouble shoot it?

0 Likes 0 ·
Joerg Vogel avatar image Joerg Vogel Braydn T commented ·

@Braydn T, Glenn has asked already a new question? That is answered.

0 Likes 0 ·