question

Yogi avatar image
0 Likes"
Yogi asked Felix Möhlmann commented

AGV needs to load item from multiple que's connected to different picking points

  • AGV Multiple loading stations.fsm
  • I want to perform the below tasks in my simulation model.
  • Loading: Ensure each AGV picks up items from Que 52, 40, and 43.
  • Unloading: Direct the AGVs to unload all collected items at Que 50.
  • Stopping: Program AGVs to pause at each control point for 5 minutes before continuing.

Could you help me with this?

FlexSim 22.2.0
agv
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered Felix Möhlmann commented

It is pretty much always easier to build your own Process Flow instead of using the template options for something they are not meant to do.

The pauses at the intermediate CPs can be implemented through the Waypoint system in the AGV Network Properties.

agv-multiple-loading-stations_1.fsm


· 4
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.