Operator Utilization fix

Hi Flexsimers,
I have use case where the operators are linked to a timetable and during off shift time, I am facing an issue where my expected state for op_3,4,5 is off shift instead it is showing processing state, and this is reflecting the utilization plot. How can I fix this issue ?
Thanks in advance for you time and interest.

1724047276055.png

FlexSim 24.2.0
state chartoperator utilization
1724047276055.png (380.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered
"processing" is not a state an operator would normally enter, so I assume you set the state manually somewhere. This then likely happens regardless of the current state of the operator, overriding the "off shift" state.
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Hemanth Sai Kumar avatar image Hemanth Sai Kumar commented ·

Hi Felix,

Thanks for your time, now the issue is resolved I was manually changing the state of the operator after removing that its running as expected

0 Likes 0 ·