I'm looking to use the experimenter to scale my production area. I recently learned about editing the QTY within groups which has been very useful for qty of operators and processors. I am currently having trouble with turning a whole shift of operators ON / OFF with the experimenter. Each operator is tied to timetables. I thought if i toggled the timestable in the experimenter it would turn the shift ON/OFF. In the case when i disable the timestable the operator turns into being available all the time (similar to as if there was no timestable tied to the operator).
How do i make the experimenter toggle a shifts worth of people tied to a specific times table?
Attaching an update to the file i attached will be very useful.