question

Madeline Z avatar image
0 Likes"
Madeline Z asked Joseph Gillespie edited

How do I make both AGV paths run at the same time?

I have two processes for AGVs. How do I make them work at the same time?

FlexSim 19.0.0
agvmovement
· 4
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joseph Gillespie avatar image
0 Likes"
Joseph Gillespie answered Joseph Gillespie edited

@Madeline Z

The only problem I found with your model was that your AGV process flow was buggy. I disconnected AGV1 and AGV2 from the AGV process flow and connected them to the AGV2 process flow and it worked.

Here is the model: helpagvanswer.fsm

For future reference, using multiple AGV paths should always work as long as AGV paths have their own process flow, though one of yours doesn't need a process flow since you are using the AGVs as task executors for your queues:

Hope this helps!


capture6.png (6.6 KiB)
helpagvanswer.fsm (216.6 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.