Hello,
I have a problem with creating the simulation. In my model, I want to create a loading and unloading process using AGV trailer ( 3 trailer connect)
1. I have three loading point (Queue) & three unloading point (Queue) - Shown in image
my agv load the batch of quantity( 6nos) from each loading point (queue) in each trailer and deliver them to the queue based on the label attached to the flowitem.
How would i attach three trailer in the agv? AGV should load all queue item before reaching to unloading point (if batch is not rwady it should wait)
How would i load batch of quantity in the each trailer (not in the agv)
Can anyone suggest possible ways?