question

Isaac Casas avatar image
0 Likes"
Isaac Casas asked Isaac Casas commented

It is posible separete the utilization chart of the operators by shift?

im running a production plan for a week. and i have 3 shifts per day. that minds that the utilization by operator by shift it will depends on the different activities and cycle times that they run.

at this moment i have 1 average graph at the end of the week, but I don't know what shift or what day my operators were used more or less.

FlexSim 23.2.0
utilizationequipment utilization tracking
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Diego Avila avatar image
2 Likes"
Diego Avila answered Isaac Casas commented

Hi Isaac,

In the following article there is a documented example using ProcessFlow and Statistics Collector to show operator or machine utilization by time period of day or per shift.

Article: Operator Utilization by Shift/Time Period - FlexSim Community

· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Isaac Casas avatar image Isaac Casas commented ·
Thank you very much Diego
0 Likes 0 ·