article

Paul Toone avatar image
0 Likes"
Paul Toone posted

TimeTables Tutorial Introduction   

This tutorial will introduce you to the TimeTable tool. The TimeTable can be used to specify specific times when a FixedResource or a TaskExecuter are scheduled to be down. This could be due to a break, maintenance, repairs, etc.


What You Will Learn

  • How to create TimeTables and assign members.
  • How to use a TimeTable to specify down times for your processors and operators.

Approximate Time to Complete this Lesson

This lesson should take about 15-20 minutes to complete.


Model Overview

In this model we will have multiple operators performing a task. A TimeTable will be created to specify when an operator is on break. Another TimeTable will schedule maintenance for the processors.

Click here for the Step-By-Step Tutorial.



flexsim users manual
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Article

Contributors

paul.t contributed to this article

Navigation

FlexSim 2016.1