article

Paul Toone avatar image
0 Likes"
Paul Toone posted

OnReceiveTaskSequence   

Overview

This trigger is called on any dispatcher object (including all task executers). It is fired whenever the object receives a task sequence. This trigger can be used to override the default passing logic, allowing more control over which object will receive the task sequence.

Access variables:

current: the current object

ts: the task sequence



flexsim users manualusers manual
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Article

Contributors

paul.t contributed to this article

Navigation

FlexSim 2016.1