Dispatch Task Sequence   

The Dispatch Task Sequence activity can dispatch a task sequence to a task executer (such as an Operator or Transporter). Generally you won't need to use the Dispatch Task Sequence activity with your task sequences because the Create Task Sequence activity and other task sequence activities will be dispatched immediately by default.

However, you could use a Dispatch Task Sequence if you would prefer to build a series of task sequences first and dispatch them later. There are two different methods you can use to build a task sequence that is dispatched later:

  1. You could use a Task Sequence Global List. (See Global Lists for more information.) Using this method, fixed resources can push task sequences to the list or you can manually create the task sequences and push them to the list. When ready, you can pull a task sequence from that list and then dispatch it to the appropriate task executer using this activity.
  2. You could use a Create Task Sequence activity to create a task sequence but set the Task Executer / Dispatcher property to None. (See Create Task Sequence for more information about this property.) You can then build the entire task sequence without dispatching it to a task executer. When ready, you can dispatch the task sequence to the appropriate task executer using this activity.

Connectors

The Dispatch Task Sequence activity only allows one connector out. See Adding and Connecting Activities for more information.

Properties

The following image shows properties for the Dispatch Task Sequence activity:

Each of these properties will be explained in the following sections.

  • Name You can change the name of the activity using the Name box. See Name for more information about this property.
  • Font The Font button opens a window to edit the activity's background color and font properties. See Font for mor eiinformation about this property.
  • Statistics The Statistics button opens the activity's statistics window. See Statistics for more information about this property.
  • Task Sequence(s)Use the Task Sequence(s) box to select the task sequence or array of task sequences that will be dispatched. Task sequences that have already been dispatched will not redispatch.
  • Task Executer / DispatcherUse the Task Executer / Dispatcher box to select the task executer or dispatcher that you want to assign the task sequence to.
  • Wait Until CompleteIf the Wait Until Complete box is checked, the token will be held in the activity until this task has been completed.
flexsim users manualuser manuals
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Article

Contributors

paul.t contributed to this article

Navigation

FlexSim 2016.1